• Home
  • About
  • Project
  • Stakeholder Information
  • More
    • Home
    • About
    • Project
    • Stakeholder Information
  • Home
  • About
  • Project
  • Stakeholder Information

Get in touch

The Forthwind team are committed to communicating with and responding to the needs and interests of project stakeholders and the local community. If the information you are seeking is not on this website, please drop us an email with your request to

info@ciercoenergy.com


or you can contact us on 01383 662 160 

NOTICE OF A DECISION

FORTHWIND LIMITED


ELECTRICITY ACT 1989


MARINE (SCOTLAND) ACT 2010


THE ELECTRICITY WORKS (ENVIRONMENTAL IMPACT ASSESSMENT) (SCOTLAND) REGULATIONS 2017


THE MARINE WORKS (ENVIRONMENTAL IMPACT ASSESSMENT) REGULATIONS 2017


Notice is hereby given that Forthwind Limited, registered under company registration SC470580 at The Boathouse, Hawkcraig Road, Aberdour, Burntisland, Fife, KY3 0TZ has been granted by the Scottish Ministers:


• consent under section 36 of the Electricity Act 1989;

• declaration under section 36A of the Electricity Act 1989; and

• a marine licence under section 20 of the Marine (Scotland) Act 2010,


to construct and operate an offshore generating station and associated ancillary works located approximately 1.5km from the coast of Methil with a total area of approximately 9639m2 with co-ordinates as per below: (WGS84)


Latitude                                                          Longitude

56° 10.383' N                                              003° 01.333' W

56° 09.883' N                                              003° 00.167' W

56° 09.867' N                                               003° 00.167' W

56° 09.867' N                                               003° 00.167' W

56° 09.750' N                                               003° 00.517' W

56° 09.667' N                                              003° 00.651' W

56° 09.667' N                                               003° 00.651' W

56° 09.667' N                                               003° 00.667' W

56° 09.667' N                                              003° 00.651' W

56° 09.667' N                                              003° 00.651' W

56° 09.751' N                                              003° 00.533' W

56° 09.883' N                                              003° 00.183' W

56° 10.367' N                                              003° 01.333' W

56° 10.383' N                                              003° 01.333' W

56° 10.383' N                                              003° 01.333' W

56° 10.383' N                                              003° 01.333' W

56° 10.383' N                                              003° 01.333' W


The proposed generating station will comprise one wind turbine generator with a maximum height to blade tip of 280m above Highest Astronomical Tide and associated ancillary equipment.


The Scottish Ministers have also made a declaration under section 36A of the Electricity Act 1989 to extinguish the public rights of navigation in so far as they pass through those places within territorial seas where the structures forming part of the offshore generating station are to be located.


The decision notice outlining the reasons and considerations on which the decision is based together with related documentation are available for inspection online at https://marine.gov.scot/ml/forthwind-demonstration-project and https://forthwind.co.uk/ or upon written request to: The Scottish Government, Marine Scotland Licensing Operations Team, Marine Laboratory, 375 Victoria Road, Aberdeen, AB11 9DB.


A copy of the decision notice has also been sent to City of Edinburgh Council, East Lothian Council and Fife Council to be made available for public inspection on the planning register  

Public Exhibition

Forthwind held a pre-application consultation event at the Fife Renewables Innovation Centre between 11am and 7pm on Monday 13th December 2021. The information boards used during the public exhibition are available below in the Project Documentation section of this page as a pdf document.

Project Documentation

 The Forthwind team are happy to address any stakeholder questions or  concerns. 

As the project progresses the Forthwind will place key documents and information on this website to assist with the understanding of the project.   

Figure 1.1 - Site Location Plan (pdf)

Download

210014 Forthwind Scoping Report C2 (pdf)

Download

211208 Forthwind Exhibition A3 (pdf)

Download

Forthwind NTS (pdf)

Download

Forthwind EIAR - Volume 1 (pdf)

Download

Forthwind EIAR - Volume 2 - Figures and Visualisations - Part 1 (pdf)

Download

Forthwind EIAR - Volume 2 - Figures and Visualisations - Part 2 (pdf)

Download

Forthwind EIAR - Volume 2 - Figures and Visualisations - Part 3 (pdf)

Download

Forthwind EIAR - Volume 2 - Figures and Visualisations - Part 4 (pdf)

Download

Forthwind EIAR - Volume 3 - Technical Appendices (pdf)

Download

Forthwind EIAR - Volume 4 - Compliance Plans (pdf)

Download
  • Privacy Policy

Forthwind Limited

The Boathouse, Hawkcraig Road, Aberdour, Fife, KY3 0TZ

+44 (7808) 706 750

Copyright © 2023 Forthwind - All Rights Reserved.

Powered by GoDaddy

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

DeclineAccept